Save $5,000 on every dig

The City of Saskatoon is saving an estimated $425,000 a year on about 85 curb stop replacements with hydrovac + EasyDig shoring. That's about $5,000 saved on every dig.

Video: City of Saskatoon, 2025 Service, Savings & Sustainability Report

City of Saskatoon: $5,000 saved per dig

Saskatoon crews complete about 85 curb stop replacements a year. By switching to hydrovac excavation with EasyDig shoring, the City saves about $5,000 per replacement and expects to save an estimated $425,000 a year, as reported in its 2025 Service, Savings & Sustainability Report. A curb stop replacement that once needed a 7–9 person crew now needs less than half the crew and equipment, time on site has dropped from about seven hours to five, and there's no large excavation damage to restore.

$5,000saved per dig
~85 digsper year
$425,000estimated annual savings for the City of Saskatoon
Read the full article for more information → As featured in Municipal Sewer & Water →

“A New Way Forward,” Municipal Sewer & Water, September 2026

Where the savings come from

  • Smaller crews: less labour on every job.
  • Less equipment: no large excavator or dump trucks hauling spoil.
  • Less restoration: a small circular footprint means less pavement, curb and landscaping to replace.
  • Faster jobs: more repairs completed per crew per day.
  • Safer digs: patented, engineered shoring with tabulated data.

$75,000 saved on a single job

A Georgia contractor went 24 ft down to bedrock to set a power distribution centre at a natural gas plant.

See what your city could save

Join our free monthly live Zoom demo. Pick the date that works for you.

Register for our monthly demoRequest a quote

or call 1-855-485-EASY (3279)